CNP 230kV Backbone Project

BORED PILING WORKS

As one of the foundation specialist in the country, Power China/S&P had chosen the service of Redviper on drilling and bored piling works to commence on implementing the 2.0 meter diameter by 16.5 meter concrete bored piles with a total of 14 linear meter piles for the CNP 230kV Backbone Project has attain the given schedule on time.
  • Magdugo, Toledo City