Panglao Offshore Bridge 3

Bored Piling Works

Bohol’s thriving tourism industry had required the construction of a third bridge for the
Tagbilaran–Panglao route. WTG construction had sought the services of Redviper drilling and pile
construction expertise to implement the project. RVDC delivered 38-1.5 diameter concrete piles with
a total of 680 linear meters on schedule for the construction of the super structure timeline.

  • Panglao, Bohol






Previous
Next
Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on google
Google+

Leave a comment

Your email address will not be published. Required fields are marked *