Panglao Offshore Bridge 3
Bored Piling Works
Bohol’s thriving tourism industry had required the construction of a third bridge for the
Tagbilaran–Panglao route. WTG construction had sought the services of Redviper drilling and pile
construction expertise to implement the project. RVDC delivered 38-1.5 diameter concrete piles with
a total of 680 linear meters on schedule for the construction of the super structure timeline.
- Panglao, Bohol
Previous
Next
Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on google
Google+