Panglao Offshore Bridge 3

Bored Piling Works

Bohol’s thriving tourism industry had required the construction of a third bridge for the Tagbilaran–Panglao route. WTG construction had sought the services of Redviper drilling and pile construction expertise to implement the project. RVDC delivered 38-1.5 diameter concrete piles with a total of 680 linear meters on schedule for the construction of the super structure timeline.