Completing 69 concrete bored piles with varying diameters from 1.20 diameters; 1.50 diameters to 1.80 diameters at an average depth of 29.5 meters for the JEG Tower was Redviper’s initiation into the bored pile construction industry. Managed and supervised by capable personnel backed-up by years of experience as foundation specialist ; JEG Tower now stands as a testament that JDC ACASIA ONE were at good hands in trusting Redviper to deliver the project as per contract.